• Bunnings

Bunnings

MSC has developed a strong working relationship with Bunnings since MSC was first engaged to work on a new store at The Hub in Whakatane in 2005. Since then, MSC has gone on to work on several other sites and store developments for Bunnings.

MSC now works with Bunnings on new site and structural designs, having an in-depth understanding of each site as well as Bunnings’ specifications. When undertaking structural design, knowing Bunnings’ racking layout for the stores has been critical to understanding where structural columns are to be placed. MSC is now also familiar with Bunnings’ need for a high quality concrete floor to give the finish required for a retail complex.

As the relationship has developed over the years between the two parties, so have good lines of communication to ensure MSC achieves Bunnings specific requirements.

The developments have ranged from single storey stores to two level developments with underground carparks.

The work for Bunnings Silverdale, for example, involved MSC designing the enabling works and managing the contract for Bunnings. The site works included 21,000m3 of earthworks, a 180m long 900mm diameter culvert, and retaining walls to the southern and northern boundaries. MSC then worked alongside Bunnings to deliver structural and civil engineering expertise on the main building contract.

“From pre-planning for projects, through the resource consent process and documentation to the final design and successful project completion – it’s all part of our commitment to our partners,” says MSC director Geoff Chilcott.